Screen zone
Lighting near the presentation screen. Review its effect on the displayed image and viewing comfort.
ILLUSTRATIVE / CONTROL INTENT
See how a designer, installer and owner can discuss the same lighting behaviour before equipment and programming are finalised.
You can also use your browser's Print command. The page is designed for printing.
ILLUSTRATIVE / FOR PROJECT DISCUSSION
A sample lighting-control brief for a room with a presentation screen, meeting table and daylight perimeter.
This is a discussion example, not a completed project or installation specification. Equipment models, lighting levels, delays and responsibilities remain to be agreed. Emergency and life-safety systems are outside this example.
01 / Room and zone names
Use the same room and zone references in drawings, the scene schedule and the final configuration records.
Lighting near the presentation screen. Review its effect on the displayed image and viewing comfort.
Lighting for reading and meeting tasks. Agree the required response for work and presentation scenes.
Lighting alongside the window area. Review daylight response and its interaction with manual scene selection.
These labels identify functional zones. They are not DALI addresses, group numbers or KNX group addresses. Final luminaire assignments and addresses belong in the agreed project schedule.
02 / Scene schedule
The everyday scene uses the table and daylight zones; presentation also changes the screen zone. Confirm exactly which groups each scene controls.
| Scene | Trigger | Lighting response | To agree |
|---|---|---|---|
| Everyday work | Presence detected | Task lighting follows the agreed setpoint; perimeter lighting responds to daylight. | Sensor coverage and setpoint |
| Presentation | Presentation scene selected | Screen-zone lighting dims while the table retains reading light. | Scene priority and glare |
| Cleaning | Authorised manual selection | Selected lighting groups enter the cleaning scene. | Override and exit behaviour |
| Unoccupied | Agreed vacancy period reached | Relevant lighting groups switch off after the delay. | Timeout and manual override |
Light levels, delays and priorities are defined for the room, users and local project requirements. No fixed energy-saving result is implied.
Priority is a design decision. Agree how manual scene selection interacts with presence and daylight inputs, how cleaning mode ends, and when normal automatic operation resumes. The table does not prescribe an override hierarchy.
03 / Interface review
Record the selected models, evidence and open decisions before treating the brief as ready for implementation.
04 / Site tests to agree
The local project team turns these prompts into a site test plan. Record the outcome, reviewer and any follow-up for each item.
Acceptance criteria and testing methods are set for the project. This checklist does not define electrical testing or safety procedures.
05 / Handover checklist
Agree which final files are included, who owns them and how the installer and owner will receive them.
Use this in a discussion